Eastern and Western Range (EWR) 127-1
Range Safety Requirements

The following document was published jointly by the 45th Space Wing (Cape Canaveral Air Station, FL) and the 30th Space Wing (Vandenberg Air Force Base, CA). It presents the users of the Eastern and Western Ranges with a common set of requirements that will help minimize safety risks and maximize range user objectives. This document has been mirrored from Headquarters Space amd Missile Systems Center, Directorate of Systems Acquitition, Acquisition Health and Safety.  (This link also leads to MSWord versions of these chapters.)



Chapter/Title


Ch. 1: Eastern and Western Range Safety   
Policies and Processes
97fw.pdf  
97index.pdf  
99ewr-c1.pdf  
Ch. 2: Flight Analysis Requirements 97ewr-c2.pdf  
Ch. 3:Launch Vehicle, Payload, and Ground Support   
Equipment Documentation, Design, and Test Requirements
99ewr-c3.pdf  
Ch. 4: Airborne Range Safety System Documentation,  
Design,and Test Requirements
97ewr-c4.pdf  
Ch. 5: Facilities and Structures Documentation, Design,  
Construction, Test, and Inspection Requirements
97ewr-c5.pdf  
Ch. 6: Ground Personnel, Equipment, Systems, and  
Material Operations Safety Requirements
99ewr-c6.pdf  
Ch. 7: Flight Control Documentation, Systems, and  
Procedural Requirements
97ewr-c7.pdf  
Appendix 3A: Missile System Prelaunch Safety Package 97ewr-3a.pdf  
Appendix 4B: RSS Qualification, Acceptance, and Age  
Surveillance Test Appendixes
97ewr-4b.pdf